Upcoming Road Projects

Upcoming Road Projects
Posted on 04/15/2021


Road Maintenance and Paving

The Town of Cheshire will be  milling and  paving, crack sealing and chip sealing mid spring to late summer. For more information please click here or contact the Public Works department at 203-271-6650.

 

State of Connecticut DOT High Friction Surface Treatments

Transportation Commissionner Joseph Giulietti, announced that the Connecticut Department of Transportation (Department) is planning to install a high friction surface treatment (HFST) at thirty-three curves on State-owned and maintained roads in District 1 which includes Route 68 (Prospect Road) at Tress Road (2 Curves). The treatment will be applied to the roadway pavement within the limits of the curve in order to restore and/or maintain the pavement friction along the curve. These upgrades will be in compliance with national standards and will allow motorists to maintain better control of their vehicle during dry and wet driving conditions. The project is being designed and is tentatively scheduled to be constructed during the 2022 construction season. For more information please click here.

Contact Us

Useful Links

Search
Town of Cheshire | All Rights Reserved | Powered by CivicLive | © 2024 Civiclive.